Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
In this Workflow Example we will demonstrate how to use the MIM WAL to build a Workflow that can be used to create a set in the FIM / MIM Portal that is an All Resources Set. When Creating a new Resource in the FIM / MIM Portal it is important to remember to create a Set that contains all of the resource that you just created. This step is often overlooked and although it is not difficult it could be automated with a simple workflow. Additionally this example demonstrates how to work with Filters in a workflow.
Prerequisites:
- Read The MIMWAL (Custom Workflow Activity Library)
- Add "Forefront Identity Manager Service Account" to the Administrator Set
- Create an "_All Resources" Sets with the Criteria of Created Time after 1 day ago (this is to ensure that the workflow will only be triggered for Resources Created after yesterday.
- In the FIM Portal navigate to the Workflows Page
- Click on New
- Enter the name for your Workflow (I start all my workflows with an "_" which makes it easy to identify all non custom workflows.
- For Workflow Type Select
- Action
- For Run On Policy Update
- (Leave unchecked)
-
- Click on Next
- Click on Select
- For Activity Display Name type something like "Create Resource Set" or what ever you wish to call this activity.
- For Resource Type
- Set
- For Advanced Features
- (Leave Unchecked)
- For Attribute Population add the following
Value Expression |
Target |
"_ALL "+[//Target/DisplayName] |
DisplayName |
"<Filter xmlns:xsi="https://www.w3.org/2001/XMLSchema-instance" xmlns:xsd="https://www.w3.org/2001/XMLSchema" Dialect="https://schemas.microsoft.com/2006/11/XPathFilterDialect" xmlns="https://schemas.xmlsoap.org/ws/2004/09/enumeration">/"+[//Target/Name]+"</Filter>" |
Filter |
Make sure the entire text above in the Value Expression for the Target Filter is entered into the Value Expression.
- Click on Save
- Click on Next
- Click on Finish
- Click on Submit
Post Operation Steps
- Create Transition In MPR with using the "_All Resources" set that was created as part of the prerequisite steps above.